Skip to main content
Get a Quote in 60 Seconds Call Us 855-241-8884

Fill Dirt delivery in Orange Park, FL

free delivery · you pick the date

Need fill dirt delivered in Orange Park? Order bulk fill dirt near you with same-day delivery. Compare prices on premium fill dirt for your construction or landscaping project.

Where are you located?

Enter your zip code for local pricing

Need exact quantities? Use the fill dirt calculator →

Fill Dirt

Fill Dirt in Orange Park

Fill Dirt

Clean, screened fill dirt for grading, leveling, and backfilling projects. Essential for raising elevation, filling holes, and preparing sites for construction.

Prices are ZIP-regional — enter yours for an all-in delivered price.

How It Works

How Hello Gravel Works?

Simple, fast, and reliable fill dirt delivery in Orange Park

Find Your Material

Browse our products or take our quiz to find the right material for your project.

Calculate Amount Needed

Use our calculator to determine quantity. Calculator found on any product page.

Schedule Delivery

Choose your preferred date and time frame. Place your order online. We will call to confirm within 24 hours.

Materials Delivered

We source materials locally through our trusted supplier network and deliver straight to your home or job site in Orange Park.

Why Orange Park Chooses Hello Gravel

Trusted by homeowners and contractors throughout Orange Park

Reliable Local Delivery

On-time delivery from vetted local suppliers you can trust.

High Quality Standards

Materials are quality checked to ensure 100% satisfaction.

Local Support Team

We will be with you through delivery. Call us any time if you need to make any changes to your order.

Quick Turnaround

Next-day delivery available if ordered before noon CST. Most orders delivered within 2-4 business days.

Local Insights

What to know about Orange Park

Why Orange Park homeowners choose Hello Gravel

Orange Park is part of a growing Northeast Florida community with a city population of 76,627 and a metro area population of 1.6+ million. Local development is steady (growth rate: 0.90% annually), and the subtropical climate (sunny days: 220/year, annual rainfall: 52.00 inches, hardiness zone: 9b) drives specific landscaping and site-prep needs. Homeowners and contractors here frequently tackle grading, driveway base work, garage pads, and yard re-leveling to manage stormwater and expansion. That steady demand makes quality fill materials important: properly sourced fill dirt reduces future settlement, improves drainage, and creates a reliable base for paving, structures, and planting beds in Orange Park soil conditions.

Popular projects in Orange Park this season

  • Yard Grade Raise Fill Dirt - 80 tons
  • Driveway Base Fill Dirt - 40 tons
  • Garage Slab Fill Dirt - 60 tons
  • Retaining Wall Fill Dirt - 25 tons
  • Raised Garden Fill Dirt - 10 tons

Orange Park quick facts

Location
Jacksonville, FL
Population
76,627
Metro Area
1.6+ million
Annual Rainfall
52.00 inches
Sunny Days
220/year
Hardiness Zone
9b
Growth Rate
0.90% annually
Delivery Coverage
Citywide delivery available

Best times for Orange Park projects

Drier Fall Window
Ideal Compaction
High Rain Risk
Slow Compaction

Local handoff

Want help with fill dirt in Orange Park?

Share your ZIP and what you need help with. We'll use this page as context when we follow up.

  • Share the page context so we know what you were looking at.
  • Ask about pricing, material choice, delivery timing, or quantity.
  • Keep it simple if you are not sure what you need yet.

We'll use this page context so you do not have to explain everything from scratch.

02

Fill Dirt delivery questions

How much does a dump truck load of fill dirt cost in Orange Park, FL?

Prices vary by supplier, but in Orange Park a typical tri-axle dump truck load (about 10-12 cubic yards) commonly ranges from roughly $200 to $600 for the material plus delivery. Final price depends on local availability, moisture content, and access; get an exact quote through Hello Gravel by entering your zip code and preferred delivery date.

How much area will 1 cubic yard of fill dirt cover?

One cubic yard equals 27 cubic feet and will cover about 324 sq ft at 1 inch thickness. For practical projects, 1 cubic yard covers about 108 sq ft at 3 inches or about 54 sq ft at 6 inches.

How many tons are in 1 cubic yard of fill dirt?

Fill dirt weight varies with moisture and compaction but in Orange Park you can expect roughly 1.2 to 1.4 tons per cubic yard. Use that range when converting between yards and tons for ordering and when checking your truck or trailer capacity.

Is fill dirt cheaper than topsoil in Orange Park?

Yes. Fill dirt is usually less expensive than topsoil because it has lower organic matter and is meant for grading or structural fill rather than planting. If you need to grow grass or plants, plan to cap fill dirt with 4–6 inches of topsoil or compost.

Can I use fill dirt to level my backyard in Orange Park?

Yes, you can use fill dirt to raise low spots or change grade, but it should be placed in thin lifts (6–12 inches) and compacted to reduce future settlement. After grading, add a topsoil layer where you want to plant grass or gardens for healthy growth.

How much fill dirt do I need for a 100 ft driveway in Orange Park?

It depends on width and depth. For a 100 ft long by 10 ft wide area: 2 inches depth needs about 6.17 cubic yards, 6 inches depth needs about 18.5 cubic yards. For driveways you usually want proper base material and compaction; fill dirt is for grade adjustments rather than final driving surface.

Is 2 inches of fill dirt enough for a driveway base?

No. Two inches of fill dirt is not sufficient for a driveway base. Driveways require a compacted aggregate base (typically 4–8 inches of crushed stone) for stability; fill dirt can be used to adjust grade before installing the proper base material.

How much area will a typical dump truck of fill dirt cover at 6 inches thick?

A typical tri-axle load of about 10 cubic yards will cover roughly 60 sq ft at a 6-inch depth. Coverage changes with truck size and compaction, so confirm yardage with your Hello Gravel quote.

How many cubic yards can a 7x14 dump trailer hold for fill dirt?

Capacity depends on side wall height, but a 7x14 trailer with 1.5–2 ft sides generally holds about 4 to 6 cubic yards of loose fill dirt. Always check the trailer's safe weight limit, because a few cubic yards can exceed a small vehicle's payload.

What does 1 yard of fill dirt look like?

One yard is a cube about 3 ft on each side (27 cubic feet). In Orange Park that volume of fill dirt typically weighs about 1.2–1.4 tons and looks like a compact pile roughly the size of a large hot tub.

Will 1 yard of fill dirt fit in my pickup truck?

Maybe, but often not safely. A small pickup bed may hold roughly 0.5 to 1 cubic yard loose, but the weight (around 1.2–1.4 tons per yard) can exceed payload limits. Check your truck's payload rating before loading and consider delivery by Hello Gravel if you need multiple yards.

How much does 100 cubic yards of fill dirt cost near Orange Park?

At local rates you can expect a wide range; 100 cubic yards typically runs from a few thousand dollars to higher depending on supplier, delivery distance, and hauling constraints. For an accurate price for 100 yards at your Orange Park address, request a volume quote through Hello Gravel.

When is the best time to place and compact fill dirt in Orange Park?

In Northeast Florida, aim for drier months outside the rainy season (generally November through April) so material is easier to work and compact. Avoid heavy rains during placement to reduce washout and excessive settlement, and coordinate timing with your contractor or Hello Gravel delivery window.

How should I prepare my site in Orange Park before fill dirt delivery?

Clear vegetation and debris from placement areas and mark utility locations before delivery. Provide clear access for dump trucks and note any driveway or overhead restrictions when ordering through Hello Gravel so the driver can safely offload the material.

Ready for fill dirt in Orange Park?

Enter your ZIP for an all-in delivered price — you pick the date.

Get fill dirt pricing