Olathe Stormwater Cost Share Reimbursement Program
The program may support one of these project types: Build a Rain Garden, Bioswale, or Runoff-Management Yard, Create a Native, Pollinator, or Conservation Yard, or Stabilize a Streambank, Shoreline, Slope, or Eroding Area.
- Run by
- City of Olathe Stormwater Management
- Service area
- Existing Olathe residential and commercial properties. New development is excluded.
Program at a glance
- Benefit
- Match: 50% of eligible material equipment and labor cost. Rain garden bioswale stream buffer native planting: up to $1,000.00. Rain barrel: up to $75.00 each. Compost bin: up to $75.00.
- Who
- Existing Olathe residential and commercial properties. New development is excluded.
- Where
- Existing Olathe residential and commercial properties. New development is excluded.
- Qualifying project
- The program may support one of these project types: Build a Rain Garden, Bioswale, or Runoff-Management Yard, Create a Native, Pollinator, or Conservation Yard, or Stabilize a Streambank, Shoreline, Slope, or Eroding Area.
Quick check
Do the main rules appear to fit?
Your answers stay in this page session. The program makes the final decision.
Answer each question for a cautious result.
The rules remain visible here even if the interactive check is unavailable.
The finished result
What project qualifies?
This program may support more than one approved project route. The program’s plan and written decision control which route applies to the property.
An approved planted feature slows, stores, filters, or infiltrates runoff on the property. The property gains approved living plants or habitat that saves water, protects soil, or improves water quality. An approved natural, structural, or combined practice stabilizes soil and protects water or habitat.
Build a Rain Garden, Bioswale, or Runoff-Management Yard
An approved planted feature slows, stores, filters, or infiltrates runoff on the property.
See the full project guide →Create a Native, Pollinator, or Conservation Yard
The property gains approved living plants or habitat that saves water, protects soil, or improves water quality.
See the full project guide →Stabilize a Streambank, Shoreline, Slope, or Eroding Area
An approved natural, structural, or combined practice stabilizes soil and protects water or habitat.
See the full project guide →What the project may require
A product can be one part of the work. The approved project, timing, design, and proof control.
Complete the approved property project
requiredCreates the finished outcome the program supports.
The program may support one of these project types: Build a Rain Garden, Bioswale, or Runoff-Management Yard, Create a Native, Pollinator, or Conservation Yard, or Stabilize a Streambank, Shoreline, Slope, or Eroding Area.
Official path: official page
How to apply or check the program
- 1
Confirm the property
Verify the service area, account, ownership, applicant, and property type with City of Olathe Stormwater Management.
- 2
Open the current official program source
Use the official program link below.
- 3
Collect the before-project evidence
Ask for the current document checklist.
- 4
Get approval when required
Get written approval before removing, buying, signing, or installing anything the program treats as project work.
- 5
Complete only the approved scope
Keep design changes and material substitutions in writing.
- 6
Submit the completion package
Ask what after photos, invoices, inspections, or certifications are required.
Details to confirm
- A landscape project started before the initial inspection and approval is ineligible.
- The $1,000 cap applies to the landscape project group, not each material.
- The BMP approval is not a substitute for required permits.
Examples that do not qualify
- Buying gravel, soil, mulch, or another product by itself does not create eligibility.
Questions people ask
Is this a rebate for buying gravel or another material?
No. The program supports the qualifying property project described above. A material purchase matters only when it serves the approved design and follows the program’s payment rules.
Can I start before applying?
Get written approval before removing, buying, signing, or installing anything the program treats as project work.
Does appearing eligible guarantee funding?
No. Current status, funding, ranking, inspection, and final approval can still affect the outcome.
Who decides whether a material substitution qualifies?
The program or its designated designer. Ask City of Olathe Stormwater Management to approve the exact substitute in writing before ordering.
Last verified 8/11/26
Official sources
Use these official sources for current rules, availability, and application details.
Report a change or missing programMore programs to check
Alaska Streambank/Lake Shore Restoration Cost-Share
The official sources do not publish one simple amount.
Arkansas Stream Habitat Program
Agfc stream team: lesser of $5,000.00 or 25% of actual total project cost.
Atlanta Post-Development Stormwater Management Ordinance
Cash benefit: none. Required retention: first 1.0 inch of runoff on site.
