DeKalb County Stormwater Utility Credit Program

The program may support one of these project types: Build a Rain Garden, Bioswale, or Runoff-Management Yard, Replace Pavement or Build a Permeable Driveway or Patio, or Fix Yard Drainage and Reduce Flood or Sewer-Backup Risk.

Run by
DeKalb County Department of Public Works, Roads and Drainage
Service area
Developed properties in unincorporated DeKalb County and the City of Stonecrest that pay the county stormwater utility fee.

Program at a glance

Benefit
Maximum credit: 40%. Credit components: four 10% performance credits. 2025 single ERU annual fee: $120.00. Implied single ERU maximum annual savings: $48.00.
Who
Developed properties in unincorporated DeKalb County and the City of Stonecrest that pay the county stormwater utility fee.
Where
Developed properties in unincorporated DeKalb County and the City of Stonecrest that pay the county stormwater utility fee.
Qualifying project
The program may support one of these project types: Build a Rain Garden, Bioswale, or Runoff-Management Yard, Replace Pavement or Build a Permeable Driveway or Patio, or Fix Yard Drainage and Reduce Flood or Sewer-Backup Risk.

Quick check

Do the main rules appear to fit?

Your answers stay in this page session. The program makes the final decision.

1. Is the property in the official service area or account group?

A city mailing address may not match a utility or watershed boundary.

2. Does the property need one of the approved project routes listed above?
3. Have you checked the approval rule before buying or starting work?

Many programs need before photos, an inspection, or written approval.

Answer each question for a cautious result.

The rules remain visible here even if the interactive check is unavailable.

The finished result

What project qualifies?

This program may support more than one approved project route. The program’s plan and written decision control which route applies to the property.

An approved planted feature slows, stores, filters, or infiltrates runoff on the property. Impervious pavement is removed or replaced with an approved surface and base that lets water pass through. An approved project reduces runoff, standing water, basement flooding, sewer backup, or repeated flood loss.

Build a Rain Garden, Bioswale, or Runoff-Management Yard

An approved planted feature slows, stores, filters, or infiltrates runoff on the property.

See the full project guide →

Replace Pavement or Build a Permeable Driveway or Patio

Impervious pavement is removed or replaced with an approved surface and base that lets water pass through.

See the full project guide →

Fix Yard Drainage and Reduce Flood or Sewer-Backup Risk

An approved project reduces runoff, standing water, basement flooding, sewer backup, or repeated flood loss.

See the full project guide →

What the project may require

A product can be one part of the work. The approved project, timing, design, and proof control.

Complete the approved property project

required

Creates the finished outcome the program supports.

The program may support one of these project types: Build a Rain Garden, Bioswale, or Runoff-Management Yard, Replace Pavement or Build a Permeable Driveway or Patio, or Fix Yard Drainage and Reduce Flood or Sewer-Backup Risk.

Official path: official page

How to apply or check the program

  1. 1

    Confirm the property

    Verify the service area, account, ownership, applicant, and property type with DeKalb County Department of Public Works, Roads and Drainage.

  2. 2

    Open the current official program source

    Use the official program link below.

  3. 3

    Collect the before-project evidence

    Property and owner information. Engineering or facility documentation showing eligible performance level. Maintenance commitment.

  4. 4

    Get approval when required

    This record does not require program preapproval, but purchase, pickup, account, permit, or maintenance rules may still apply.

  5. 5

    Complete only the approved scope

    Keep design changes and material substitutions in writing.

  6. 6

    Submit the completion package

    Ongoing maintenance records and compliance information when requested.

Details to confirm

  • March 31 is the billing-year deadline.
  • The four credits are performance tiers, not four material purchases.
  • The current $120.00 single-ERU fee makes the typical residential maximum only about $48.00 per year.

Examples that do not qualify

  • Buying gravel, soil, mulch, or another product by itself does not create eligibility.

Questions people ask

Is this a rebate for buying gravel or another material?

No. The program supports the qualifying property project described above. A material purchase matters only when it serves the approved design and follows the program’s payment rules.

Can I start before applying?

This record does not require program preapproval, but purchase, pickup, account, permit, or maintenance rules may still apply.

Does appearing eligible guarantee funding?

No. Current status, funding, ranking, inspection, and final approval can still affect the outcome.

Who decides whether a material substitution qualifies?

The program or its designated designer. Ask DeKalb County Department of Public Works, Roads and Drainage to approve the exact substitute in writing before ordering.

Last verified 8/11/26