Skip to main content
Get a Quote in 60 Seconds Call Us 855-241-8884
Fill Dirt available for delivery in Evansville

Fill Dirt in Evansville, IN

Need fill-dirt delivered in Evansville? Order bulk fill-dirt near you with same-day delivery. Compare prices on premium fill-dirt for your construction or landscaping project.

Fill Dirt

Fill Dirt

$16.00/ton

Clean, screened fill dirt for grading, leveling, and backfilling projects. Essential for raising elevation, filling holes, and preparing sites for construction.

What's your delivery ZIP code?

Quality Checked
Flexible Delivery
Secure Checkout

Related Materials Available in Evansville, IN

Fill-Dirt For Floodplain And Grading Stability • Fast Fill-Dirt Delivery Across Metro

Fill Dirt — bulk aggregate available for delivery

Fill Dirt

Clean, screened fill dirt for grading, leveling, and backfilling projects. Essential for raising elevation, filling holes, and preparing sites for construction.

Starts at: $16.00

Material handoff

Want help with fill dirt delivery in Evansville?

Share your ZIP and what you need help with. We'll use this material and city page as context when we follow up.

  • 1 This page gives us the fill dirt and Evansville context.
  • 2 Ask about pricing, delivery timing, material choice, or quantity.
  • 3 The material is preselected, but you can change it if the project shifted.

We'll use this page context so you do not have to explain everything from scratch.

How It Works

How Hello Gravel Works?

Simple, fast, and reliable fill-dirt delivery in Evansville

Find Your Material

Browse our products or take our quiz to find the right material for your project.

Calculate Amount Needed

Use our calculator to determine quantity. Calculator found on any product page.

Schedule Delivery

Choose your preferred date and time frame. Place your order online. We will call to confirm within 24 hours.

Materials Delivered

We source materials locally through our trusted supplier network and deliver straight to your home or job site in Evansville.

Why Evansville Chooses Hello Gravel

Trusted by homeowners and contractors throughout Evansville

Reliable Local Delivery

On-time delivery from vetted local suppliers you can trust.

High Quality Standards

Materials are quality checked to ensure 100% satisfaction.

Local Support Team

We will be with you through delivery. Call us any time if you need to make any changes to your order.

Quick Turnaround

Next-day delivery available if ordered before noon CST. Most orders delivered within 2-4 business days.

Local Insights

What to know about Fill Dirt in Evansville

Why Evansville homeowners choose Hello Gravel

Evansville, with a city population of 156,670 and an annual growth rate of 1.20%, is seeing steady residential and infrastructure development that increases demand for reliable bulk materials. Located along the Ohio River and sitting in hardiness zone 8b, the area gets 228 sunny days/year and an average annual rainfall of 34.32 inches, which together create a temperate but occasionally wet environment for yards, driveways, and foundation work. Homeowners and contractors in Evansville need dependable fill to grade lots, raise low spots, and backfill foundations so projects stay on schedule and stand up to seasonal moisture. That drives interest in low-organic, compactable fill-dirt that reduces settling and provides a stable base for landscaping, patios, and structural backfill.

Popular projects in Evansville this season

  • Yard Grading fill-dirt - 15 tons
  • Driveway Base fill-dirt - 40 tons
  • Retaining Wall Backfill fill-dirt - 30 tons
  • Foundation Backfill fill-dirt - 350 tons
  • Lot Raising fill-dirt - 800 tons

Evansville quick facts

Location
Evansville, IN
Population
156,670
Metro Area
2.7+ million
Annual Rainfall
34.32 inches
Sunny Days
228/year
Hardiness Zone
8b
Growth Rate
1.20% annually
Delivery Coverage
Citywide delivery available

Best times for Evansville projects

Stable Fall Moisture
Spring Thaw Risk
High Heat Drying
Frozen Ground Limits

Material Calculator for Evansville Projects

Calibrated for desert landscaping and Evansville property sizes

Get started by entering your details below!

Quantity Recommendations

Orders Under 5 Tons - Add 20% extra to your estimated gravel needs.

5+ Ton Orders - Add around 10% to ensure enough additional material on hand.

Material depth visualization

Want to ensure you order the right amount?

Get a callback from our specialist during business hours. Enter your details below!

Frequently Asked Questions - Evansville Fill Dirt Delivery

Everything you need to know about fill dirt delivery in Evansville.

Is fill dirt cheaper than gravel to buy and deliver in Evansville, IN?

Yes. Fill dirt is usually less expensive per cubic yard than processed gravel because it is unprocessed subsoil with fewer processing costs, and in the Evansville area local suppliers often price it lower. Delivery costs depend on weight and distance and are similar for both materials, but expect fill dirt to be the cheaper material overall.

How much does one cubic yard of fill dirt cost near Evansville and what does it cover?

Prices in the Evansville area typically run approximately $15 to $30 per cubic yard delivered, depending on source, truck access, and seasonal demand. One cubic yard covers 27 cubic feet, which will raise 100 square feet by about 3.25 inches, so it is best thought of as a bulk, inexpensive way to add grade or fill low spots.

How much fill dirt will I need and what will it cost to prepare a 20 ft wide gravel driveway base in Evansville?

For a common driveway example (20 ft wide by 50 ft long) a 4-inch compacted fill dirt base requires about 12.4 cubic yards. At local delivered rates of $15 to $30 per cubic yard, the fill-dirt portion would be roughly $185 to $370, not including gravel, compaction, or spreading labor.

How many cubic yards of fill dirt do I need for 1,000 sq ft at typical depths (2u0022, 3u0022, 4u0022)?

Use this quick rule: volume cu yd = (area in sq ft * depth in feet) / 27. For 1,000 sq ft: 2u0022 = about 6.2 cu yd, 3u0022 = about 9.3 cu yd, and 4u0022 = about 12.3 cu yd. These are loose volumes; allow a small extra amount for compaction and settlement when ordering.

Can I lay gravel directly over untreated fill dirt in my Evansville backyard?

You can, but it is not ideal, especially with local Indiana clay. For best results grade and compact the fill dirt first, remove organic material, and add a compacted crushed-stone base or geotextile fabric before putting down gravel to reduce rutting and sinking. This approach improves drainage and the long-term performance of the gravel surface.

Can fill dirt be used to level a backyard in Evansville, or should I use topsoil or other aggregate?

Fill dirt is appropriate for building up grade, filling low spots, and creating structural elevations, but it is not good for planting because it lacks organic matter. If you plan to grow grass, plants, or a garden, add a layer of topsoil on top of compacted fill dirt; for drainage-sensitive areas in Evansville's clay soils, consider engineered aggregate (crushed stone or sand) to improve permeability.

How many wheelbarrow loads or pickup truck loads equals 1 cubic yard of fill dirt in real delivery terms?

One cubic yard equals 27 cubic feet, which is roughly eight average wheelbarrow loads (wheelbarrows hold about 3 to 4 cubic feet). A full-size pickup bed typically carries about 0.5 to 1.0 cubic yard of loose fill dirt depending on truck size, bed height, and safe payload limits, so plan for 1 to 2 pickups per cubic yard in many practical cases.

What should I put under gravel on clay soil in Evansville to improve drainage and longevity when using fill dirt as base?

Start with clean, compacted fill dirt free of vegetation and organics to establish grade. Add a layer of geotextile fabric to separate soil from stone, then install 3 to 4 inches of compacted crushed stone as a base before your wearing course of gravel; this system reduces pumping and improves drainage in heavy local clay.

Where can I order fill dirt in Evansville and what are typical delivery minimums and lead times?

You can order fill dirt through Hello Gravel by checking your zip code on our site or contacting our team; we connect you with trusted local suppliers in Evansville. Typical minimums are 3 tons (about 2 to 3 cubic yards), standard delivery is 2+ business days with next-day available for orders placed before noon CST, and delivery is by local dump trucks—confirm exact timing and any tailgate spreading request at checkout.

What will it cost to raise 1,000 sq ft by 2u0022–4u0022 with fill dirt in Evansville (coverage and example pricing)?

Using local pricing of roughly $15 to $30 per cubic yard, 1,000 sq ft requires about 6.2 cu yd at 2u0022, 9.3 cu yd at 3u0022, and 12.3 cu yd at 4u0022. That translates to approximately $93 to $370 for the delivered fill-dirt material (2u0022 = $93–$185, 3u0022 = $139–$278, 4u0022 = $185–$370), not including compaction, delivery access fees, or additional materials like topsoil or stone.

Delivery Coverage by ZIP Code

Browse the list to confirm delivery availability

47701 47722 47728 47719 47716 47730 47747 47731 47732 47711 47721 47706 47733 47704 47703 47702 47750 47734 47735 47736 47740

Need help with fill dirt delivery in Evansville?

Share your project details and we will use this material page as context when we follow up.

Get help with my project